Bangkok Mass Transit System: Mor Chit – Saphan Mai - Lum Lukka

Clients: Office of Transport and Traffic Policy and Planning
Administered by:

TEAM Consulting Engineering and Management Co., Ltd.
Geotechnical and Foundation Engineering Co., Ltd.
Daoreuk Communications Co., Ltd.

TEAM GROUP acted as the consultant in master planning, generating detailed designs for the project. We also supervised the construction of the BTS Green Line Extension, consisting of the Dark Green Line (Mo Chit-Lam Lukka Khlong 4) and the Light Green Line (Bearing-Samut Prakan).

Following the successful operation planning, feasibility studies, environmental impact assessment, detailed design preparation of tender documents and management of public participation activities for the first phase at Mo Chit-Saphan Mai, we were further entrusted with management of the second phase. This covered the 13.5-kilometer long line from Saphan Mai to Lam Lukka. The project also features a new design for the frontage road running in parallel with the track structure and connecting Phahon Yothin Road with Lam Lukka Road.