Project Management and Construction Supervision of Suvarnabhumi Airport Development Phase 2

Client: Airports of Thailand PCL.


Suvarnabhumi Airport Development Phase 2 Project is aimed at expanding all airport systems to cope with the increasing number of passengers, from 45 to 60 million per year, so that the overcrowding of both the passengers and the air traffic will be reduced. The Project is consisted of the construction of midfield satellite building 1 (levels B2, B1, G, and 2-4) and parking bays; a south tunnel extension (structural and infrastructural works, and miscellaneous systems) and extension of the east side passenger terminal, airlines office building, and east side car park building. Also included are the construction of an infrastructural system, APM system procurement and installation, backage handling system (BHS) procurement and installation, and explosive detection system (EDS).

TEAM GROUP was entrusted with the project management, work plan management, and construction supervision, inspection, and progress reporting.