Detailed Design and Tender Documents Preparation for MRT Orange Line: Contracts 1, 2

Client: CH. Karnchang PCL.

The Orange Line is a part of the Mass Rapid Transit Authority of Thailand (MRTA)’s Mass Rapid Transit Master Plan in the Bangkok Metropolitan Region, which seeks to ease traffic problems in Greater Bangkok and develop a more comprehensive network of public transport. Designed for east–west travel, the Orange Line will feature both underground and elevated sections. It will stretch from the MRT Chaloem Ratchamongkhon Line’s Thailand Cultural Centre station, move along the Wattanatham Road, go past the MRTA headquarters, and head towards Rama IX Road. It will move eastwardly past the Rama IX-Pradit Manutham Intersection to Ramkhamhaeng Road, and go past Ramkhamhaeng University and Rajamangala Stadium to reach the Lam Sali Intersection. The Khlong Ban Ma Station will be the last station on ground level. From there, the Orange Line will be elevated. The entire length will be about 13 km., covering 10 stations. For underground section (Contracts 1, 2), it is a design and build contract.

TEAM GROUP was entrusted with tender documents and tender drawings preparation, quantity take off, and underground structure, tunnel, architectural, electrical, and mechanical work design. In addition, after CH. Karnchang was awarded with a bid for Contracts 1 and 2, TEAM GROUP was entrusted with the detailed design work during construction phase for both contracts.

You are here