Energy

Refinery and Oil Terminal in Phetchaburi

Clients: Bangchak Petroleum PLC
Administered by: ATT Consultants Co., Ltd.

In their effort to expand productivity for export purpose, Bangchak Petroleum assigned ATT to conduct technical due diligence of the 25,000 barrel-per-day refinery of Siam Gulf Petrochemical Co., Ltd. and the 500 million-liter oil terminal and marine facilities of Pan Asia Storage & Terminal Co., Ltd. Located in Phetchaburi, the refinery construction was completed and commissioned in early 2006 but has never been used while the oil terminal and marine facilities construction were completed in 1999 but were partially operated.

Read more

Geological and Petroleum Engineering Research Facility Project

Clients: PTT Public Company Limited
Administered by: ATT Consultants Co., Ltd.

Located at the Innovation Center, PTT Research Institute, in Wang Noi District, Phra Nakhon Si Ayutthaya, the Geological and Petroleum Engineering Research Facility was expected to host research and development in petrochemical and geological engineering of the PTT Group. Embracing the green building concept, this facility will house a geological laboratory, a petrochemical laboratory and a researchers’ office, making a combined area of 12,000 m2.

Read more

Ethanol Plant at Na Di Sub-district, Na Yia District, Ubon Ratchathani

 Clients:  Ubon Bio Ethanol Co., Ltd., Bangchak Petroleum PCL, Thai Oil PCL
Administered by:   ATT Consultants Co., Ltd.

This project involved the construction of an ethanol plant, an office building, dormitory, necessary infrastructure and a 4.5 MW biogas plant to generate electricity for the Provincial Electricity Authority. The plant, the first of its kind in the lower northeastern region, will boast the latest ethanol production capacity in Thailand and is expected to daily produce 400,000 liters of cassava ethanol,

Read more

Two Units of a 110 MW Combined Cycle Cogeneration Plant at Amata City Industrial Estate, Rayong

ClienClients:   Toshiba Plant Systems & Services Co., Ltd. (TPSC)
Administered by:  ATT Consultants Co., Ltd.

Amata B. Grimm Power (Rayong) 1 & 2 Limited assigned TPSC the task of constructing the new generating plant. Each unit consists of two gas turbine generators, heat recovery steam generators and a steam turbine with a water-cooled condenser utilizing open-loop forced draft cooling tower.  Scheduled for completion in 2013, 

Read more