Environmental Management

Environmental Monitoring of Utai Power Plant Project, Phra Nakhon Si Ayutthaya

Client : Sino-Thai Engineering and Construction PCL
Administered by : TEAM Consulting Engineering and Management Co., Ltd.

Sino-Thai Engineering and Construction PCL will construct the Utai Power Plant in the Rojana Industrial Park in Utai District, Phra Nakhon Si Ayutthaya Province. Fueled by natural gas, the plant will produce 1,700 MW of electricity for sale to the Electricity Generating Authority of Thailand to secure domestic electricity supply. The plant is planned to commercially operate in 2015.

Read more

IEE of Thermal Incinerator at Nong Khaem Waste Management Center

Client : C&G Environmental Protection (Thailand) Co., Ltd.
Administered by : TEAM Consulting Engineering and Management Co., Ltd.

C&G Environmental Protection (Thailand) Co., Ltd. is planning to construct  a thermal incinerator at Nong Khaem Waste Management Center under the administration of the BMA. The incinerator, which is intended to replace the landfill system that often causes environmental problems, is expected to incinerate 300-500 tons of garbage a day. Output such as ashes from the incinerators can be used to produce construction materials while the heat can generate electricity.

Read more

Amendment of EHIA for Chana Power Plant Units 1-2, Songkhla Province

Client: The Electricity Generating Authority of Thailand (EGAT)
Administered by:
TEAM Consulting Engineering and Management Co., Ltd.

The Electricity Generating Authority of Thailand is planning to improve the steam turbines of the Chana Power Plant so as to make them run on both natural gas and diesel fuel. Therefore, additional devices including the fuel supply system will have to be installed. The diesel-fuel option is planned to ensure that the Chana Power Plant will be able to continue its generation services in the event that the supply of natural gas runs out or runs low.

Read more

IEE for LKU - Bueng Phra Depot Flowline Project

Client : PTTEP Siam Co., Ltd.
Administered by : TEAM Consulting Engineering and Management Co., Ltd.

In this project, an eight-inch-diameter pipeline would be installed, 1.5 meters below ground level, along a 54-km stretch from the Lan Krabue Production Station in Kamphaeng Phet Province to the Bueng Phra Crude-Oil Tank Farm in Phitsanulok Province. The project is aimed at boosting the efficiency and safety of the transportation of crude oil, to facilitate the continuous flow of petroleum production, and to minimize the oil transportation’s impact on the environment.

Read more