Transportation & Logistics

Feasibility Study and Design for the Denchai - Chiang Mai Double Track Rail Project

Client: Office of  Transport and Traffic Policy and Planning
Consultants:
TEAM Consulting Engineering and Management Co., Ltd. / TLT Consultants Co., Ltd. / Daoreuk Communications Co., Ltd. /Geotechnical & Foundation Engineering Co., Ltd.

The double track railway from Denchai to Chiang Mai. Covering an area of Phrae, Lampang, Lamphun and Chiang Mai. The track will be one meter wide (Meter Gauge). Level crossings are to be improved so that travelling will be faster and more convenient.

Read more

Survey and Detailed Design of the Highway No.225 (Nakhon Sawan – Chum Saeng District) Construction Project

Client: Department of Highways
Consultants:
TEAM Consulting Engineering and Management Co., Ltd. / TLT Consultants Co., Ltd. / Daoreuk Communications Co., Ltd.  

The Highway No.225 (Nakhon Sawan – Chum Saeng District) Construction Project involves increasing traffic lanes from two to four along the 20-kilometer section from Nakhon Sawan to Chum Saeng District in order to accommodate increasing traffic volume. The project will help facilitate business trips by car as well as goods transportation.

Read more

Feasibility Study, Environmental Impact Assessment Detailed Design and Constrution Supervision for the Construction of Bang Kruai Station, Commuter Train System Project (Red Line), Bang Sue – Taling Chan Section

Client: State Railway of Thailand (SRT) 
Consultant:
TEAM Consulting Engineering and Management Co., Ltd.

The Commuter Train System (Red Line), Bang Sue – Taling Chan Section will run for a stretch of 15 km. It was born in response to a Cabinet resolution on the urgent need for a transportation system plan, which accommodates the travel needs of people in suburban areas. The plan aims to extend rail-based services to Nakhon Pathom too. In the preliminary stage, there will be three stations for the Bang Seu – Taling Chan Section: Bang Son, Bang Bamru, and Taling Chan stations.

Read more

Feasibility Study and Design for High speed train project, Bangkok – Chiang Mai

Client: Office of Transport and Traffic Policy and Planning
Consultants:
TEAM Consulting Engineering and Management Co., Ltd. / TLT Consultants Co., Ltd. / Daoreuk Communications Co., Ltd. / Geotechnical & Foundation Engineering Co., Ltd.

The Bangkok – Chiang Mai high speed train comprises of 2 phases, which are Bangkok - Phitsanulok and Phitsanulok – Chiang Mai. The train is designed to have maximum speed of 300 Km/hour and take 3.16 hours from Bangkok to Chiang Mai. TEAM Group has undertaken the feasibility study on engineering, economic, social, financial and investment aspects, definitive and architectural design, tender document preparation, EIA, and public participation activities.

Read more