TEAM GROUP has been entrusted by Community Pharmacy Public Company Limited to design and construct its new pharmaceutical plant with the total value of 383 million baht. The project, located on Ram Intra Road, Km. 8., will consist of a manufacturing building, clean room, as well as electricity, communication and infrastructure systems.
News
Design and Construction of a New Pharmaceutical Plant with the Total Value of 383 million Baht
Floods and Droughts: A Repeat Crisis for Thailand
Thailand is now able to manage just 25 per cent of water in land-based sources. Water management, however, will only be efficient when the country can manage 30 per cent of the water in those sources. That’s why Thailand needs more dams. Read “Floods and Droughts: A Repeat Crisis for Thailand”, an article by Mr. Chawalit Chantararat, TEAMGROUP Managing Director, published in Prachachat Business, issue 11-14 April 2013, page 42.
"Design and construction of flood protection system for Bangpa-in industrial estate",
Thailand and Tsunami
It is generally understood that a tsunami occurs following a large-scale offshore earthquake. Actually, there are more facts about the giant wave. Read “Thailand and Tsunami”, an article by Songsak Paetdee from TEAM GROUP, published in Prachachat Business, issue 28-31 March 2013, page 46.


