Detailed Engineering Design and Traffic Improvement on Highway No. 117, Route : Nam Pad District – Ban Phudu.

Client: Department of Highways

TEAM GROUP has been entrusted by the Department of Highways to carry out the survey and design for the improvement and traffic problem mitigation on Highway No. 117, Route : Nam Pad District – Ban Phudu. The objective is to study and design the highway by expanding the existing 2-4 lane road to a configuration that is appropriate for future traffic volumes and levels of service, and that aligns with the topographical conditions and the national highway network. The project includes the design of road geometry, drainage systems, associated utilities, and other necessary components.

In addition, the project involves conducting an Environmental Impact Assessment (EIA) and implementing public participation activities to ensure that the development causes minimal adverse effects on natural resources, the environment, and local communities.

The project begins at Sta. 343+554 on Highway No. 117 and ends at Sta. 396+784, covering a total distance of approximately 53.23 kilometers. The alignment passes through the subdistricts of Thung Song Hong, Ban Siao, Song Khon, Fak Tha, In part of Fak Tha District, and through the subdistricts of Muang Chet Ton, In part of Ban Khok District, Uttaradit Province.

Share :