TEAM GROUP was entrusted with the survey, design, and construction supervision of the project by the State Railway of Thailand

On 18 January 2018, TEAM GROUP Foundation and TEAM GROUP led by Ms. Roongtip Koungyuttamongkol, Director, Branding and Communications,

on the capacity of the Foundation Committee and Secretary, gave a warm welcome to executives, teachers, and students from the Educational and Cultural Exchange Program 2018 between Nakhon Sawan School and Suwon Information Science High School, Korea in their visit to the construction site of the Red Line Commuter Train. TEAM GROUP was entrusted with the survey, design, and construction supervision of the project by the State Railway of Thailand.

แชร์ไปยัง :

TEAMG Reports Continued Profit Growth in Q1/2026 with Revenue of THB 631 Million, Up 26%

TEAM GROUP signed the Concession Contract for Wastewater Treatment and Water Recycling Project.

พิธีเปิด “การซื้อขายหลักทรัพย์วันแรกในตลาดหลักทรัพย์แห่งประเทศไทย” TEAMG

“PM 2.5 ภัยเงียบถล่มเมือง!”

“TEAM GROUP appointed APM as its financial consultant”

ทีมกรุ๊ป ครบรอบ 42 ปี