Project Owner : Nakhon Ratchasima Municipality
The primary objective of the project is to construct a new raw water supply and transmission system and rehabilitate aging water infrastructure in order to reduce transmission losses and accommodate rapid urban expansion within Nakhon Ratchasima Municipality and seven surrounding sub-districts. This initiative will enhance operational stability and reliability of water treatment system, ensuring drought resilient water supply while supporting future urban and economic expansion.
TEAM Consulting Engineering and Management PCL (TEAM GROUP) has been engaged to provide construction supervision services for the project, comprising the following key infrastructure components.
- Lam Ta Khong Raw Water Pumping Station: Located upstream of the Ma Kluea Mai Diversion Dam, equipped with 4 vertical centrifugal double-suction pumps, each with a capacity of 0.43 m³/s at a head of 20 meters;
- Water Transmission Pipeline (Ductile Iron): 1.20-meter diameter ductile iron (DI) pipeline with a total length of 10,671 meters, including all associated appurtenances;
- Water Transmission Pipeline (HDPE): 1.20-meter diameter HDPE pipeline (PN 8) with a total length of 25,257 meters, including appurtenances;
- Surge and Pressure Control Systems;
- Retaining Structures: Construction of L-shaped reinforced concrete retaining walls along the irrigation canal, from the Khok Faek Diversion Dam to the concrete road at Ban Noi Phatthana;
- Ban Makham Thao Pumping Station: Equipped with 10 end-suction pumps, each with a capacity of 0.15 m³/s at a head of 12 meters.
Upon the project completion, the Ban Makham Thao Water Treatment Plant will be capable of operating at its full design capacity. The local population will benefit from a reliable supply of clean, standardized potable water with stable hydraulic pressure, significantly improving people’s health, sanitation, and overall quality of life.